NORK INFECTIOUS HOSPITAL BEING REPAIRED WITH FINANCING OF<br /> HAYASTAN ALL-ARMENIAN FUND'S BRAZILIAN LOCAL STRUCTURE<br />


NORK INFECTIOUS HOSPITAL BEING REPAIRED WITH FINANCING OF
HAYASTAN ALL-ARMENIAN FUND'S BRAZILIAN LOCAL STRUCTURE

  • 10-12-2007 17:40:00   | Armenia  |  Social
YEREVAN, DECEMBER 10, NOYAN TAPAN. The second annex of the Nork Infectious Hospital is being repaired with the financing of the Brazilian local structure of the Hayastan All-Armenian Fund. The repairs of the third floor of the second annex, as well as the construction of the boiler-house are underway. As Noyan Tapan was informed by the Fund's Public Relations Department, the work will be finished at the end of this year. The Fund has put into operation the fourth floor of the second annex lately. Besides, the roof of the annex has been repaired, a heating system has been built, new doors and windows have been placed. The program's total cost is 58m drams (more than 190 thousand dollars).
  -   Social